How do you reduce maintenance overtime?

Quick answer

Reduce maintenance overtime by attacking the reactive work that drives emergency hours, planning and scheduling so jobs fit normal shifts, and using overtime deliberately for genuine peaks rather than as a default cover for poor planning.

Rising overtime with flat output is a classic symptom of a reactive plant. The overtime is usually paying for disruption that better planning would remove, so the durable fix is upstream in planning and reliability, not in the roster.

Step by step

  1. Find what the overtime is buyingAnalyse overtime by cause and you will usually find it concentrated around reactive work and a few repeat failures.
  2. Reduce the reactive driverShift work from reactive to planned so fewer jobs spill past normal hours, and eliminate the repeat failures that trigger callouts.
  3. Plan work to fit normal shiftsSchedule and resource work realistically so it can be completed in normal hours rather than routinely running over.
  4. Use overtime deliberatelyReserve overtime for genuine peaks and emergencies, with visibility of how much is being used and why.

Common pitfalls

Frequently asked questions

Is maintenance overtime always bad?
No. Some overtime for genuine peaks and emergencies is normal. The problem is structural overtime that covers for poor planning and rising reactive work.